Cluttered garage before renovation — bare bulb, stained concrete slab, bikes hanging from ceiling joists
Before
Finished Forge garage transformation — slatwall systems, LED lighting, diamond-plate workbench, glossy polyaspartic floor
After
Drag to reveal◀ ▶
Polyaspartic Floors
Slatwall Systems
LED Cabinet Lighting
Custom Cabinetry
Diamond-Plate Workbenches
Climate Control Bays
Overhead Storage
EV Charging Rough-In
Epoxy Coatings
Tool Organization
Showroom Builds
Polyaspartic Floors
Slatwall Systems
LED Cabinet Lighting
Custom Cabinetry
Diamond-Plate Workbenches
Climate Control Bays
Overhead Storage
EV Charging Rough-In
Epoxy Coatings
Tool Organization
Showroom Builds

How It Works

Five Phases.
Zero Guesswork.

Every Forge project follows the same sequenced build process — because order isn't bureaucracy, it's how you get a perfect floor on the first pour.

01Measure

Laser-Precise Site Survey

We arrive with laser distance tools and a thermal camera. Every inch of your slab, every stud bay, every ceiling joist gets documented. Most garages hide problems — low spots in the floor, out-of-plumb walls, undersized electrical panels. We find them before they become your problem.

3–4 hours on-site · Full CAD floor plan delivered in 48 hrs
Book Your Garage Walkthrough
Forge team member using laser measuring tool in empty garage during site survey
Site Survey
02Design

3D Layout Renders

Your floor plan becomes a full 3D model. You pick cabinet finishes, floor color, lighting zones, and wall systems from physical samples — not a website. We build two design options and walk you through both on a shared screen. Nothing gets ordered until you sign off on every line item.

2 design concepts · Material samples shipped to your door
Book Your Garage Walkthrough
Detailed 3D garage layout render showing cabinet placement, workbench, and floor design on screen
3D Renders
03Demolish

Clean Slate, Bare Studs

Old shelving, peg board from 1987, that pegboard that's been painted over six times — gone. We strip to the studs, patch concrete cracks with polyurea, and prep the slab with diamond grinders. The demo crew leaves the space cleaner than they found it. Your neighbors will notice.

1 day demo · Concrete prep + crack repair included
Book Your Garage Walkthrough
Empty garage stripped to bare studs and concrete slab during demolition phase
Demo Day
04Build

Trade Crews, Sequenced Installs

Electricians run new circuits before cabinetry goes in. Cabinetry gets shimmed plumb before slatwall mounts. Floor coating goes last, after every fastener is set. Each trade knows the sequence — nobody steps on fresh epoxy, nobody drills through a new cabinet run. This is where the planning pays off.

Licensed trades · Sequenced 3–5 day install schedule
Book Your Garage Walkthrough
Forge installation crew fitting custom cabinetry and workbench during garage build phase
Active Install
05Reveal

The Garage You Planned

The door goes up and everything is exactly where the 3D model said it would be. We walk through every cabinet, test every circuit, and hand you a laminated spec card with product codes for everything installed — so a replacement drawer glide is a phone call, not a mystery. Twelve-month workmanship warranty, no asterisks.

12-month warranty · Spec card for every product installed
Book Your Garage Walkthrough
Completed Forge garage transformation with gleaming polyaspartic floor, organized cabinetry, and LED lighting
Final Reveal

Completed Projects

Three Garages.
Three Different Briefs.

Scroll to explore

Start Your Project

Book Your Garage Walkthrough

A Forge project manager walks your garage, measures every wall, and delivers a full design concept — no obligation, no generic quote.

May 2026
Su
Mo
Tu
We
Th
Fr
Sa

No obligation. We confirm within 2 business hours.

Not Ready to Book?

Download our free Garage Planning Checklist — 23 questions that surface the decisions you'll need to make before any contractor sets foot in your space.

What to Expect

90-minute site visit

We measure, photograph, and ask the right questions.

CAD plan in 48 hours

Full floor plan with cabinet runs and lighting zones.

Itemized quote, no surprises

Line-item pricing for every product and trade.

12-month workmanship warranty

If it shifts, we fix it. No asterisks.

5 builds scheduled this month in your area

Book Walkthrough